HU | EN
The procedure of occupancy of DOMINO mobile house
It is transported to the site max 6-7 weeks after ordering and takes only a few hours to being installed and ready to occupy. After the assembly it needs to be attached to the water pipe, drainage and electric network. We can also equip the house with electric generator set, water tank, solar collector and solar cells on demand.